Pages Menu
Categories Menu

Posted by on Oct 17, 2016 in Blog |

Commercial Prefab Construction in Dubai

Commercial Prefab Construction in Dubai

If you think there is nothing new in commercial prefab construction, think again.

It was proposed as the world’s first prefabricated skyscraper with 40 factory-built modules for each floor. Fisher said that 90% of the tower could be built in a factory and shipped to the construction site. This would allow the entire building to be built more quickly. The core of the tower must be built at the construction site.

Fisher said that the prefabricated portions would decrease the project’s cost and the number of workers, and that construction will take 30% less time than a normal skyscraper of the same size. The majority of the workers would be in factories, working under safer conditions. Kitchen and bathroom fixtures would be pre-installed. The core would serve each floor with a special, patented connection for clean water, based on technology used to refuel airplanes in mid-flight.

The entire tower is proposed to be powered from wind turbines and solar panels. Enough surplus electricity should be produced to power five other similar sized buildings in the vicinity. The turbines would be located between each of the rotating floors. Fisher said that they could generate up to 1,200,000 kilowatt-hours of energy. The solar panels are expected to cover the roof and the top of each floor.

The tower is expected to constantly change its shape.
As of 2016, construction of the Dynamic Tower has not started, but there are rumors that it could be a reality by 2020.

Article Credit:  Modular Home Coach

 Contact USModular, Inc. for your commercial modular construction project.    info@usmodularinc.com      888-987-6638

Call Now Button